Monday, 23 November 2026Cataluña 18°/ 11°

Breaking

Júcar-Vinalopó transfer

Latest Júcar-Vinalopó transfer news

1 article

Albatera-Catral train station with palm tree, platforms and industrial buildings in the background.

The Generalitat will invest 7.7 million to bring water from the Júcar to Albatera

The Generalitat is preparing a two-kilometre pipeline to bring water from the Júcar to the Los Suizos reservoir, benefiting 1,049 irrigators.